Get a quote

Guides · Tools and reference to plan your cargo

The data first. Then the truck.

Equipment dimensions, legal weights by country, border crossings, documents and transit times for Central America, each with its source and its review date. And three tools to put your shipment together before you ask for a price.

19 equipment typesContainers, dry vans, flatbeds and chassis
6 countriesLegal weights and dimensions
18 border crossingsCrossing by crossing
71 termsIn the glossary, in Spanish and English

Build your shipment: no sign-up, no email

Three tools. You choose and you see the result. From the planner you can send the route for a quote with the origin and the destination already filled in.

Try the planner with a routeMoín → San JoséSan José → ManaguaSan José → GuatemalaSan José → Panama

Shortcuts: straight to the data

Six facts that are often needed before a shipment. Each shortcut opens the page at the exact spot.

The reference: 11 pages for planning

Tables, dimensions, steps and documents. Each page says where the data comes from and when it was reviewed.

No source, no data.

A weight table without a source is no use for dispatching a truck. That is why every figure in these guides shows where it came from, when it was reviewed and how firm it is.

93

Records on equipment, weights by country, border crossings, ports, routes, restrictions and documents

51

Records confirmed in a primary source. The other 42 carry the indicative label

280

Sources cited: 84 official, 74 from ports, shipping lines and manufacturers and 122 secondary

September 2026

Last review of the data

The source first

Each figure was first looked up in the country’s regulation, the customs authority, SIECA, the port, the shipping line or the equipment manufacturer. Under each table is the list of sources with their links.

Firm or indicative

What is confirmed in the primary source is presented as firm data. What only has secondary support, or comes with caveats, carries this label and has to be confirmed before dispatch:

indicative

What is not known is not made up

If a figure could not be verified, the cell shows a dash or asks you to confirm it with your GoTruck contact. Transit times are always a range with its causes of variation, never a promise.

Reference, not advice.General reference information, checked against official sources on September 30, 2026. It is not legal, customs or commercial advice and does not replace the text of the regulations or the terms of each contract. The rules change: confirm your case with your GoTruck contact and with your customs broker before shipping.

From question to truck: five steps

If this is your first road shipment in the region, this is the order that saves phone calls.

  1. Choose the equipment

    Container, dry van or flatbed: it depends on what you move and how it is loaded.

    Container types and dimensions · Dry vans, flatbeds and chassis

  2. Check the legal weight

    Each country sets a maximum based on the truck’s axles. Compare it with the actual weight of your cargo.

    Weights and dimensions by country · Load calculator

  3. Plan the route

    Kilometers, border crossings and indicative days, before you commit to a delivery date.

    Route planner · Transit times

  4. Get the documents ready

    Which document is needed, who issues it and what your Incoterm says about who books the truck.

    Documents: DUCA-T, waybill · Incoterms 2020

  5. Ask for the truck

    With equipment, weight, route and documents clear, the quote comes out right the first time.

    Get a freight quote

Got the data? Ask for the truck.

With equipment, weight, route and documents clear, the quote comes out right the first time. Tell us what you move.

WhatsApp